The nearest TfL ultra-rapid EV hub to Enfield is open at East Finchley station. TfL says 64% of outer London homes have no off-street parking to charge at.
Drivers in Enfield who cannot charge at home now have an ultra-rapid charging hub in neighbouring Barnet, in the car park of East Finchley Underground station on High Road. Its eight bays run on 400kW chargers that can add up to 100 miles of range in five minutes to a compatible vehicle, according to Transport for London (TfL). None of the five sites the scheme plans to start building in 2027 is in Enfield.
The hub opened earlier this month. It is the second built by a joint venture between the charging company Fastned and Places for London, TfL’s property company, and TfL says it took eight months from planning consent to opening.
Overview
- Where: East Finchley Underground station car park, High Road, on the Northern line.
- What: eight ultra-rapid bays with 400kW chargers, under Fastned’s yellow solar canopies.
- Speed: up to 100 miles of range in five minutes for compatible vehicles, TfL says.
- Who runs it: Fastned and Places for London, in a joint venture.
- Next: at least five more London sites to start in 2027 (Dagenham Dock, Hillingdon, Hounslow East, Redbridge and West Barking), and up to 25 by 2030.
Why outer London drivers are the target
TfL’s Travel Demand Survey found that 64 per cent of households in outer London, and 93 per cent in inner London, have no private off-street parking. The release says that lack of driveways is a key obstacle to people switching to electric cars, and that high-powered public hubs are needed to keep residents, commuters, taxis, private hire vehicles and commercial fleets moving.
That matters for Enfield’s minicab drivers in particular. TfL is consulting until 2 December on a plan for every private hire vehicle newly licensed in London to be fully electric from July 2028; our story on the minicab consultation has how many drivers live in each Enfield postcode and how to respond.
Seb Dance, Deputy Mayor for Environment and Energy, said: “To tackle the climate crisis, clean up our air, and build a net-zero city, we must make switching to electric vehicles seamless for every Londoner. The Mayor’s goal is for London to have 40,000 EV chargers by 2030 and the incredible momentum achieved by Fastned and Places for London proves what can be achieved when bold ambition meets rapid delivery.
“From Hatton Cross to East Finchley, and with monumental sites like Hanger Lane coming soon, this roll-out is vital for the thousands of drivers who don’t have access to a driveway. Together, we are hitting our stride and ensuring London remains at the global forefront of the green transport revolution as we continue to build a fairer and greener London for everyone.”
What the East Finchley hub has
East Finchley is the first of the venture’s sites with Fastned’s yellow solar wings. All its sites run on 100 per cent renewable energy, according to the release, and have extra-wide bays, clear sightlines and lighting, 24/7 multilingual support and fully accessible spaces in line with British Standards Institution guidance. Barnet Live has more on the East Finchley hub.
The venture’s first hub, at Hatton Cross near Heathrow Airport, opened in April 2026. TfL says it supported more than 1.1 million zero-emission kilometres in its first six months, the equivalent of 28 laps of the Earth.

Tom Hurst, UK Country Director at Fastned, said: “We are building real momentum across London. In less than a year, we’ve proven that well-designed, ultra-rapid charging changes the game for drivers. With Hatton Cross answering a critical local demand, East Finchley now welcoming drivers, and our game-changing 36-bay Hanger Lane flagship taking shape, we’re showing what the future of urban charging looks like.
“Securing planning for key sites in Barking and Dagenham, Hillingdon and Redbridge gives us the springboard to accelerate even faster. Drivers want fast, reliable, safe charging that fits naturally into their day.”
The sites planned for 2027
The venture has nine planning consents and is waiting on decisions for three more. Construction is due to start in 2027 on at least five sites with 66 bays between them, which would take the network to eight sites and 122 bays:
- Dagenham Dock: 16 bays and a retail unit.
- Hillingdon: 12 bays in the station car park.
- Hounslow East: 8 bays in the station car park.
- Redbridge: 12 bays in the station car park, just off the A406.
- West Barking: 18 bays and a retail unit.
Work is also under way at Hanger Lane in Ealing, on unused land in the Park Royal industrial estate. Due to open in spring 2027 with 36 bays, it is set to be London’s largest ultra-rapid EV charging destination, with a shop, toilets and outdoor seating. Fully electric cement mixers are being used on the site, TfL says.

John Colgan, Electric Vehicle Charging Hubs Programme Manager at Places for London, said: “Seeing our joint venture with Fastned move at such a pace is hugely exciting. By unlocking TfL’s estate, we are transforming accessible land into critical, sustainable infrastructure where the capital needs it most.
“Every new bay we deliver helps decarbonise our transport network, supports local air quality, and generates revenue to be reinvested directly back into London’s transport system.”
In Enfield, Places for London’s estate includes the shop units at Piccadilly line stations; our report on its £1bn milestone has the details, including a kiosk to let at Oakwood.
London’s charging network in figures
- More than 29,500 public charging devices, around a third of the UK total, including more than 2,000 rapid or ultra-rapid devices.
- Between 860,000 and 1,049,000 electric vehicles projected on London’s roads by 2030, 29 to 36 per cent of the city’s car and van fleet.
- Around 43,000 to 51,000 more charge points expected to be needed to meet that demand, several thousand of them 50kW or above.
- TfL estimates that the growth in electric vehicles, with the charging to support it, could cut London’s annual carbon emissions by between 1.5 million and 2.6 million tonnes by 2030.
Source: Transport for London press office.
Have your say